BC OGC Safety Advisory 2010-03 Communication during fracture stimulation

Safety Advisory 2010-03 Communication during fracture stimulation by the BC Oil and Gas Commission, May 20, 2010.
Fracture propagation via large scale hydraulic fracturing operations has proven difficult to predict. Existing planes of weakness in target formations may result in fracture lengths that exceed initial design expectations.

This entry was posted in Case News, Global Frac News. Bookmark the permalink.